For both bridges the following works were carried out:
examination of the fabric by the institute Dr. Schellenberg, protection of the foundations, replacement of bridge waterproofing, road surface, draining, cornice, curp and railing (crash barrier).
BW 6Concrete-arch-bridge over the brook Rohrbach from 1952 Clearance 6.17 m
- headroom 5.00 m
- Total breath 6.35 m, length 18.00 m
- Construction costs: € 125.000
BW 7Mixed construction steel-concrete over the brook Ettersbach from ca. 1950
- Clearance 2.17 m, headroom 2.55 m
- Total breath 5.35 m, length 8.65
- Crossing angle 59 gConstruction costs: € 55.000
- Construction time: 2009
Services of our office:
- planning of the redevelopment
- tender procedure
- supervision of the works
|